Lincoln Peak Base Area Development Phase II

Lincoln Peak Village

 

Major Subdivision/Planned Unit Development/Conditional Use Review

Application - December 1, 2011

 

Table of Contents:

 

1)          Subdivision/PUD and Conditional Use Applications, Fee Schedule and Fee

Project Description

Abutter List, Notification Letter and Proof of Notification

 

2)          Subdivision/PUD Worksheets and Conditional Use Worksheet

 

3)          Subdivision Plan (Grenier Engineering)

- Survey Plan of December 1, 2011,

 

Final Survey Plan of, September 6, 2012 and was approved by the DRB on Sept 17, 2012.,

 

4)          Landscape & Lighting Plans (SE Group)


-        LA-001 Existing Conditions

-        LA-002 Circulation Diagram

-        LA-003 Master Plan

-        LA-100 Overall Site Plan

-        LA-101 Site Plan Garage Level

-        LA-102 Phase 1 Site Plan

-        LA-400 Planting Plan

-        LA-401 Phase 1 Planting Plan

-        LA-500 Lighting Plan

-        LA-501 Phase 1 Lighting Plan

-        LA-502 Lighting Detail


 

5)          Grading/Erosion Plans (Grenier Engineering)

-        Existing Conditions Plan

-        Steep Slopes Analysis

 

6)          Architectural Plans (The Design Group)

-        Master Plan Summary Spreadsheet (Unit Detail)

-        Rice Brook Residences Spreadsheet (Unit Detail)

-        A2.0 Ground Level Floor Plan Rice Brook Residences

-        A2.1 First Level Floor Plan Rice Brook Residences

-        A2.2 Second Level Floor Plan Rice Brook Residences

-        A2.3 Third Level Floor Plan Rice Brook Residences

-        A2.4 Roof Level Floor Plan Rice Brook Residences

-        A3.1 Exterior Elevations Rice Brook Residences

 

7)          Project Comparison

 

8)          Stormwater/EPSC Permits

 

9)          Hotel Brook

 

10)      Water / Wastewater Analysis & Basis of Design

 

11)      Traffic & Parking

 

12)      Declaration of Condominium

 

13)      Municipal & Fiscal Impact Analysis

 

14)      Existing/Previous Town Permits