
Lincoln Peak Base Area Development Phase II
Lincoln Peak Village
Major Subdivision/Planned Unit Development/Conditional Use Review
Table of Contents:
1) Subdivision/PUD and Conditional Use Applications, Fee Schedule and Fee
Project Description
Abutter List, Notification Letter and Proof of Notification
2) Subdivision/PUD Worksheets and Conditional Use Worksheet
3) Subdivision Plan (Grenier Engineering)
- Survey Plan of December 1, 2011
- LA-001 Existing Conditions
- LA-002 Circulation Diagram
- LA-003 Master Plan
- LA-100 Overall Site Plan
- LA-101 Site Plan Garage Level
- LA-102 Phase 1 Site Plan
- LA-400 Planting Plan
- LA-401 Phase 1 Planting Plan
- LA-500 Lighting Plan
- LA-501 Phase 1 Lighting Plan
- LA-502 Lighting Detail
5) Grading/Erosion Plans (Grenier Engineering)
- Existing Conditions Plan
- Steep Slopes Analysis
6) Architectural Plans (The Design Group)
- Master Plan Summary Spreadsheet (Unit Detail)
- Rice Brook Residences Spreadsheet (Unit Detail)
- A2.0 Ground Level Floor Plan – Rice Brook Residences
- A2.1 First Level Floor Plan – Rice Brook Residences
- A2.2 Second Level Floor Plan – Rice Brook Residences
- A2.3 Third Level Floor Plan – Rice Brook Residences
- A2.4 Roof Level Floor Plan – Rice Brook Residences
- A3.1 Exterior Elevations – Rice Brook Residences
8) Stormwater/EPSC Permits
9) Hotel Brook
10) Water / Wastewater Analysis & Basis of Design
11) Traffic & Parking
12) Declaration of Condominium
13) Municipal & Fiscal Impact Analysis
14) Existing/Previous Town Permits